Parking Structures

Allure Condominiums Parking Structure
Honolulu, HI

Allure Condominiums Parking Structure

Owner:
Fifield Companies

Architect:
Architects Hawaii

Engineer:
Englekirk Partners

Project Size:
275,000 SF, 458 spaces

Five-story parking structure with roof-top recreational deck as part of the 35-story Allure Condominium Tower. Originally envisioned as a below-grade structure, Pankow's value analysis led to a more efficient parking design, greatly reducing construction cost.

To build the deck, Pankow used BIM to resolve the complexities of combining swimming pool, tree wells, structural beams and sloping slabs.

Burien Transit-Oriented Development Phase 1 Parking Structure
Burien, WA

Burien Transit-Oriented Development Phase 1 Parking Structure

Owner:
Alliance Property Group/Wasatch Advantage Group

Architect:
Watry Design

Engineer:
KPFF Consulting Engineers

Project Size:
133,600 SF, 505 spaces

Design-Build Delivery

Public Private Partnership

Exterior skin is a combination of open cable rail and precast spandrel panels, greenscreen, glass and architectural panels. Bas relief murals on each side of the garage, depicting the key mountains and mountain ranges surrounding Seattle and the Puget Sound, were created in conjunction with a sculptor carving directly into the shotcrete then stained and painted.

The five-story structure will support a newly constructed King County Bus Transit Center and is designed and constructed with a 50-year useful life.

Cupertino Square Macy’s and JC Penney Parking Structures
Cupertino, CA

Cupertino Square Macy’s and JC Penney Parking Structures

Owner:
Cupertino Square LLC

Architect:
HNA Pacific

Engineer:
KPFF

Project Size:
JC Penney – 242,000 square feet, 654 stalls and 43,000 square feet of retail space; Macy’s – 230,000 square feet, 723 stalls

Design-Build Delivery

Projects were fast-tracked to meet the owner’s needs for completion before the holiday shopping rush. Macy’s TCO was achieved one month ahead of schedule and the JC Penney structure was completed in just seven months.

Vehicular and pedestrian traffic to this operating mall passed through the construction area, requiring a detailed traffic maintenance plan to ensure public safety and ease of shopper access during construction.

Department of Public Social Services Parking Garage
Los Angeles, CA

Developer:
Vermont Village Human Services Corp.

Architect:
Nadel/HNA Pacific

Engineer:
BP Consulting Engineers

Project Size:
148,500 SF, 492 spaces

Design-Build Delivery

Public-Private Partnership

The structural system of this garage included the innovative precast "lite beam" that uses less concrete material yet is as strong as traditional beams, providing savings on the cost of transportation and minimizing emissions.

Eastern Columbia Parking Structure
Los Angeles, CA

Eastern Columbia Parking Structure

Owner:
The Kor Group

Architect:
HNA Pacific

Project Size:
96,000 square feet, 250 stalls

In addition to the conversion of the landmark Eastern Columbia Building into condominiums, Pankow constructed an adjacent parking structure. The free-standing, poured-in-place structure consists of three levels of above-grade and two levels of below-grade parking.

Award winner
Jack London Square
Oakland, CA

Jack London Square

Owner:
Ellis Partners

Architect:
HNA Pacific/Lowney Architecture

Engineer:
KPFF

Project Size:
322,463 square foot garage, 1,092 stalls; 31,668 square feet of retail; 30,000 square foot Amtrak bus dock

Design-Build Delivery

Project challenged included its location within 20 feet of railroad tracks and underground Caltrans tunnel and facing difficult underground conditions (contaminated soil, high water table, heterogeneous fill). Design-build enabled us to streamline design duration, select the most efficient construction activities and provide creative measure to mitigate challenges.

The concrete shear wall is articulated with a dynamic pattern of reveals and form ties.

Project included the construction of two pedestrian bridges – one 180-foot span over three railroad tracks and one 80-foot span – linking garage to neighboring office and retail buildings.

Metlox Town Square Parking Structure
Manhattan Beach, CA

Metlox Town Square Parking Structure

Owner:
City of Manhattan Beach

Developer:
Tolkin Group

Architect:
Tolkin & Associates

Engineer:
Thornton Tomasetti

Project Size:
184,000 square feet, 462 stalls

Design-Build Delivery

Pankow constructed the two-level subterranean parking structure as the first phase to the mixed-use retail, commercial and hotel development.

Award winner
Montage Beverly Hills Parking Structure
Beverly Hills, CA

Owner:
City of Beverly Hills

Architect:
HKS/Hill Glazier Studio

Engineer:
Magnusson Klemencic

Project Size:
525,191 SF, 1,172 spaces

LEED Gold Certified

Public-private Partnership

The 1,172 car, four-level subterranean parking garage is part of the Montage Hotel Beverly Hills mixed-use development constructed on a 2.5 acre site in the heart of Beverly Hills' Golden Triangle.
The magnitude of the project, challenges of a dense urban site and excavation and shoring operations extending 42 feet into a public right-of-way required careful planning and coordination with many parties. Pankow led the project team’s efforts with the City of Beverly Hills’ Planning and Public Works departments to seek creative solutions. The result, a successfully executed traffic and logistics plans that minimized impact on surrounding businesses, ensured public safety and kept the project on track.
Pacific Plaza Parking I & II
Daly City, CA

Developer:
Summit Commercial

Architect:
KMD/HNA Pacific

Engineer:
KPFF Consulting Engineers

Project Size:
Garage I: 295,000 SF, 925 spaces; Garage II: 264,770 SF, 820 spaces

Design-Build Delivery

Fast-track Project

The site is located less than one-half kilometer from the San Andreas fault, requiring larger design loads to handle the seismic loads. The structure utilized a shear wall lateral resisting with cast-in-place slabs supported by precast columns and beams.

The two six-story, seven-level parking structures were constructed adjacent to the Pacific Plaza office complex.

Stanford Parking Structure 5
Palo Alto, CA

Owner:
Stanford University

Architect:
ELS Architects/HNA Pacific

Engineer:
KPFF Structural Engineers

Project Size:
481,132 SF, 1,509 spaces

Fast-track project

Moment frame structural system

Structure was built using Pankow's innovative Precast Hybrid Moment Resistant Frame (PHRMF).

Award winner
Sunset + Vine Parking Structure
Los Angeles, CA

Developer:
HW/CJUF Hollywood LLC

Architect:
Nakada & Associates/HNA Pacific

Engineer:
Nakaki Bashaw Group, Inc.

Project Size:
281,691 SF, 833 spaces

Design-Build Delivery

Placing the parking structure at the center of the mixed-use block and wrapping the retail and residential uses around it, not only provided convenient parking for shoppers and residents, but also mitigated the visual impact these large structures typically have in historically sensitive environments.

Award winner
Waikiki Beach Walk Parking Garage
Honolulu, HI

Owner:
WBW Retail LLC/DGM Group

Architect:
Altoon + Porter

Engineer:
Englekirk Partners

Project Size:
70,000 SF, 270 spaces

Constructed in association with the 90,000 SF open-air Waikiki Beach Walk retail center, the parking garage also incorporates a recreation deck for the adjoining Embassy Suites Towers.

Environmental graphics inspired by local floral patterns and wave forms are drawn from the island.

© 2012 Pankow. All rights reserved. WebMail | Pankow FTP | Sitemap
Website Credits
We target the most challenging projects and hire the best people